From the scenario to commissioning
We implement lighting, movement and sound control in museums and exhibitions. We connect the show scenario with devices and daily exhibition operation.
You can start a conversation and request an individual quote now
How your exhibition control takes shape
We start with what visitors should experience. The work involved and the system handover are defined in the project scope.
- 01
Scenario
We define the show’s starting point, responses and sequence of events.
- 02
Hardware and connections
We check devices, interfaces and installation conditions.
- 03
Scope and quote
We agree on tasks, responsibilities and the terms of cooperation.
- 04
Scene configuration
We assign actions to devices and arrange their sequence.
- 05
Commissioning and testing
We test devices, complete scenes and exhibition operation.
- 06
System handover
Materials and operator preparation are agreed as part of the quote.
Three parts of an individual quote
The app licence, hardware and integration work each have their own scope. We select them to suit the scenario and the current installation.
App
Licence and featuresThe plan is selected to match how the system will be used.
Hardware
Controllers and devicesCompatibility of existing components is confirmed using their specifications and documentation.
Integration
Work on the exhibitionConfiguration, commissioning and handover within the agreed scope.
For a new exhibition or an extension to existing control. Scope, schedule and terms depend on the individual project.
An idea is enough to get started
You do not need a finished technical design. Three pieces of information will help:
What should the show do?
Describe one scene: what starts it and what should happen.
What is already in place?
Add an area plan, a device list or photos of device labels.
What stage has the project reached?
Tell us the location, target date and involvement of other teams.
We can work through the technical details after the first conversation.
Explore the experience behind Micro City PLThe standalone Maqster app
Before launchWant to build scenes yourself? Sign up for news about app availability. Implementation projects can already be discussed.
Before implementation
Does the entire existing control system need replacing?
That depends on the equipment and the purpose of the changes. We first review specifications, interfaces and documentation. We can then identify components to keep and the work required.
Can lighting, mechanisms and recordings be combined in one scene?
This can be the starting point for a project. Controllers, audio devices and synchronisation methods need to be chosen for the exhibition. Feature descriptions are available in the lighting, motion and audio sections.
Does the quote cover documentation and operator preparation?
Operating materials, configuration handover and any operator preparation are defined in the quote's scope. Mention these needs in the first discussion, along with how the exhibition is used each day.
Can a project start with a small part of the exhibition?
We can discuss a stage covering one scene or a selected set of devices. Potential expansion is considered when defining the architecture, power supply and control scope.
How can I request a quote?
Open the form and describe the project. Include its current stage, main devices and the intended show sequence. We can then identify further questions and the scope needed for an individual quote.
Tell us about your exhibition
Tell us the project stage and give one example of how the show should work. We will establish what is needed to prepare the scope and a quote.